Center Hill Dam. Center Hill Dam was a U.S. Army Corps of Engineers design, built by private contractors. The dam is 2,160 feet long and 240 feet high, and it impounds the Caney Fork River for 64 miles. In 1938 Congress authorized the dam to lessen flood damage in the valleys of the Mississippi, Ohio and Cumberland Rivers. Work started in 1942 but stopped in 1943 because of World War II. It began again in 1946, the year Congress also approved recreational use of the reservoir. The dam was finished in 1951. Center Hill Powerhouse. Power production began in 1951 with three hydropower turbine-generator units. From a reservoir intake, water surges 160 feet to reach the units inside the powerhouse. The power generated goes to the switchyard, which distributes it for public use. Together the units can produce 135,000 kilowatts, enough for a city with 125,000 residents. The powerhouse was under construction from 1942 to 1952, and its architecture, in the Art Deco-Art Moderne style, is typical of those years.
Source: Tennessee Historical Commission marker 2D 54 (reworded by TennRoam)