Historic Place

Tims Ford Hydroelectric Project

Winchester · Franklin County

The landmarks the nation chose to remember.

The Story

The Tims Ford Hydroelectric Project, or Tims Ford Dam, is on the Elk River near Winchester in Franklin County. The Tennessee Valley Authority built it from 1966 to 1970, when the agency, its main river dams done, turned to remote tributary regions and worked closely with local leaders on development. The project was meant to boost the Elk River region's economy while supplying power and water, controlling floods, creating recreation and improving water quality. It was listed on August 11, 2017, for its history and engineering as part of the authority's hydroelectric system. A supplementary record limited the period of significance to the construction years, an event judged exceptionally important locally.

Source: National Register nomination MP100001465 (NPS)

About this site

Tims Ford Hydroelectric Project is a historic place in Winchester, Franklin County. It is one of 18 historic places documented in Franklin County, among 115 historic sites cataloged across the county on TennRoam.

The site sits at 35.1960, -86.2782 near Winchester. The nearest cataloged historic site is Tims Ford State Rustic Park (historical marker), about 2.1 miles away. Others within a short drive include R. N. Mann House, Falls Mills Historic District, and Falls Mill.

This record is drawn from the National Register of Historic Places (Tennessee Historic Preservation Office and National Park Service). Use the map below for its exact position and turn-by-turn directions.

Tims Ford Hydroelectric Project
Photo: Tennessee Valley Authority, Public domain, via Wikimedia Commons
History

Tims Ford Dam stands at river mile 133.3 of the Elk River, about ten miles west of Winchester, and takes its name from a pioneer ford on land owned by early settler Abner Mansfield Tims. The Tennessee Elk River Development Agency, created by the legislature in 1963, worked with TVA on a plan for the watershed. In 1965 the project was caught up in a funding contest with Tellico, and Congress approved both; work began March 28, 1966, the dam was closed December 1, 1970, and its single generator entered commercial service March 1, 1972. The compacted rock-fill embankment is 175 feet high, and the project displaced 215 families and relocated 318 graves. A small sluice unit was added in 1986 to keep water flowing below the dam, and Tims Ford State Park opened in 1978.

Sources: npgallery.nps.gov

📍 35.1960, -86.2782 · Winchester, Franklin County
Directions (Apple)Google MapsView map

Get TennRoam — 22,000+ historic sites in your pocket

See this site and every marker, battlefield, cemetery, courthouse, museum and landmark across Tennessee on one live map — find what's near you, get directions, and collect sites as you roam.

Download on the App Store
Free · ad-free · the iOS app and the web map share one account, so your visits sync across both

Nearby in Franklin County