Under the heading "Keeping the CCC Boys clean," the panel places the camp's Bath House and Latrine on this spot, the south edge of Camp S-67. Company 1475 had close to 200 young men, and most of their days went to hard, dirty physical work. They needed lots of room for showers, with sinks and toilets enough to move big groups through quickly when it was time to clean up. Water for the building was pumped up from Little Gizzard Creek, down in the canyon beneath the camp, by an electric pump. The pump sat in a small building on the creek at Blue Hole, and the pump house's old concrete foundation lies along the Grundy Day Loop trail. Nobody knows of a diagram showing just how the inside of the bath house was arranged, but there are clues in what is left of its foundation and in records from other CCC camps. Reasonably, the water would have gone first into a holding tank and been heated by a boiler, then sent on to the showers and wash rooms. Those rooms are recognizable by floors that slope in an X shape toward a drain at the center. On the far left is a large channel, or sluice, that once ran under the toilets. It collected waste and carried it from the building to a line of settling pits. There the effluent got daily treatment, typically with powdered lime. No photos of the bath house have been found. It probably resembled most other buildings in "Camp Alvin C. York": wood framing and high windows, with clapboard siding and roll roofing. According to CCC records, a standard camp layout called for showers and latrines in separate buildings, which was not so here. But camp leaders had some leeway, so it is not unusual that Camp S-67 combined the two in one building. "...and sanitary!" the panel goes on. Between the camp's beginning in June of 1935 and January of 1937, bath house sewage was treated in a chain of open pits dug in the hillside past the building's end, with lime added to keep down the odor. As waste worked its way slowly from pit to pit, solids settled out, and the water left over grew cleaner as it seeped through sand and mud. The final pit is visible beside the Grundy Day Loop trail. The system had flaws, but it handled a messy by-product of life in camp reasonably well. In January of 1937, a septic tank system, more efficient, took over from some of the settling ponds; flush toilets also went in. Inspection reports describe the tank as "pumped out as required." Today's septic tanks rely on the same basic ideas, except that the settling, percolation and purification all happen underground and out of view, in special pipes collectively called a drain field. Captions say that the old concrete foundation beside the steps and footbridge at Blue Hole is all that is left of the CCC pump house. From Little Gizzard Creek it sent water to this bath house and also to the camp laundry. A drawing gives a probable layout of the bath house, worked out from the foundation and from what is known of other CCC and military sites of that era. The settling ponds have taken no wastewater from the bath house since 1938, and nature long ago neutralized any unpleasant microbes left in them.
Source: Historical marker, reworded by TennRoam. Marker location: HMdb.org, https://www.hmdb.org/m.asp?m=276792