The Story
Lawrenceburg No. 1, on Shoal Creek at Horseshoe Bend, was the second hydroelectric plant built in Tennessee. After city voters approved bonds for it in 1905, construction began in 1905 and 1906 under project engineer Walter G. Kirkpatrick, and the plant was built in 1907. A dam held back the creek and sent water through a tunnel across the bend, a design like that of the first Tennessee plant near Winchester and the later Rock Island and Calderwood sites. It was listed for engineering and because the city built, owned and ran it, reflecting the Progressive Era preference for publicly owned utilities.
Source: National Register nomination 90000308 (NPS)
About this site
Lawrenceburg No. 1 Hydroelectric Station is a historic place in Lawrenceburg, Lawrence County. It is one of 13 historic places documented in Lawrence County, among 55 historic sites cataloged across the county on TennRoam.
The site sits at 35.2284, -87.3576 near Lawrenceburg. The nearest cataloged historic site is Lawrenceburg No. 2 Hydroelectric Station (historic place), about 1.0 miles away. Others within a short drive include Pioneers in Textiles, West Gaines Colored School, and Pow Camp Lawrenceburg.
This record is drawn from the National Register of Historic Places (Tennessee Historic Preservation Office and National Park Service). Use the map below for its exact position and turn-by-turn directions.
History
Horseshoe Bend takes its name from the creek's sharp 180-degree turn, about 1.8 miles southeast of Lawrenceburg, and the plant used that loop to gain fall between the dam and the powerhouse. The dam pairs a concrete spillway about 200 feet long with an earthen embankment of similar length,. An unlined tunnel at least six feet across splits about 200 feet in into two penstocks feeding a reinforced concrete powerhouse on a steep bank below, where two horizontal Francis turbines produced about 600 horsepower. The plant met the city's needs until 1915, when growth prompted a second station downstream, and both ran into the late 1930s, when the Tennessee Valley Authority increasingly supplied the town; No. 1 was retired in 1939 and all of its machinery removed. The city still owned the overgrown site when it was nominated, and the low flow of Shoal Creek still ran through the tunnel into the empty powerhouse.
Sources: npgallery.nps.gov