Nothing in the river's modern history has been a more serious problem than the danger of a drastic change at the Old River Junction to the channel of the Lower Mississippi River. In this area the Mississippi used to swing west through Turnbill's Bend. In 1831 a cutoff around the bend was built by Captain Henry Shreve, and that is when the situation, with its potential for disaster, started to take shape. At Turnbill's Bend two rivers had joined the Mississippi. One was a tributary of the Mississippi, the Red River. The other was the Atchafalaya River, which takes overflow from the Mississippi at high water and carries it south toward the Gulf of Mexico. Once Shreve had built the cutoff, the Atchafalaya became clogged, and when its channel was opened again, it had grown much larger. The old bend's upper arm filled up, and the Atchafalaya used the lower arm, called Old River, as its link with the Mississippi River Channel. Then in 1872 the mouth of the Red River moved so that the Red flowed straight into the Atchafalaya, making it bigger still. For years Old River carried water in both directions, depending on how high the Mississippi River stood compared with the Red River. By 1880, however, the Mississippi was flowing west into the Atchafalaya all the time. In spite of hard efforts to hold back this flow, it became clear that if nothing were done, the Mississippi channel would in time turn through Old River and reach the Gulf of Mexico by way of the Atchafalaya's channel. That would permanently cut Baton Rouge, New Orleans and all of the river industry of southern Louisiana off from the Mississippi River. Following long study, the Corps of Engineers in 1954 started a major project that aimed to find a solution to the Atchafalaya problem. By 1963 an earthen dam of huge size over the eastern end of Old River had cut off the flow of the Mississippi into the Atchafalaya River. Then came a navigation lock to give river traffic access to the Atchafalaya and the Red River. To deal with runoff at high water, an outflow channel was dredged to link the Red River with the Mississippi River at a point several miles to the north of Old River, along with an embankment built to regulate the flow. The 1973 flood did heavy damage to these structures, and once again the Mississippi threatened to turn west. Once the Corps of Engineers finishes its work to stabilize the problem at Old River, that will end a struggle of man against the Mississippi that has gone on for more than 150 years.
Source: Historical marker, reworded by TennRoam. Marker location: HMdb.org, https://www.hmdb.org/m.asp?m=116183