Historic Place

Fort Patrick Henry Hydroelectric Project

Kingsport · Sullivan County

The landmarks the nation chose to remember.

The Story

The Fort Patrick Henry Hydroelectric Project, or Fort Patrick Henry Dam, in Kingsport, Sullivan County, was designed by the Tennessee Valley Authority and the United States Army Corps of Engineers and built by the authority. Lying east of Knoxville, it was not among the projects in the authority's 1936 unified navigation plan. Construction started on August 29, 1950, the dam was closed on October 27, 1953, and its two generating units went into commercial operation on December 5, 1953, and February 22, 1954. It was listed for engineering, reflecting the authority's model-tested, site-specific designs, and for the recreation it opened up, with a period of significance of 1950 to 1965.

Source: National Register nomination MP100001477 (NPS)

About this site

Fort Patrick Henry Hydroelectric Project is a historic place in Kingsport, Sullivan County. It is one of 42 historic places documented in Sullivan County, among 146 historic sites cataloged across the county on TennRoam.

The site sits at 36.4983, -82.5086 near Kingsport. The nearest cataloged historic site is Pactolus Ironworks (historical marker), about 0.3 miles away. Others within a short drive include Great Indian Warrior Trading Path, Battle of Island Flats First Skirmish, and Battle of Island Flats.

This record is drawn from the National Register of Historic Places (Tennessee Historic Preservation Office and National Park Service). Use the map below for its exact position and turn-by-turn directions.

Fort Patrick Henry Hydroelectric Project
Photo: Tennessee Valley Authority, Public domain, via Wikimedia Commons
History

Fort Patrick Henry and Boone were presented to Congress together in 1949 and approved by President Harry Truman on September 6, 1950, as the Korean War raised demand for power from defense industries and the Atomic Energy Commission plants at Oak Ridge. TVA bought 1,466 acres in 145 tracts, displacing 22 families, and the project cost about $12.4 million in all. Its two generating units have a net dependable capacity of about 41 megawatts; the dam takes releases from Boone Dam upstream, feeds the Cherokee project downstream, and supplied cooling water to TVA's coal-fired John Sevier plant, built from 1952 to 1957. The powerhouse keeps its Streamlined Moderne aluminum doors, light fixtures and finishes, following architect Roland Wank's idea that TVA powerhouses should welcome visitors. TVA credited the four Upper Holston reservoirs with preventing an estimated $66 million in flood damage at Chattanooga during the heavy rains of 1957.

Sources: npgallery.nps.gov

📍 36.4983, -82.5086 · Kingsport, Sullivan County
Directions (Apple)Google MapsView map

Get TennRoam — 22,000+ historic sites in your pocket

See this site and every marker, battlefield, cemetery, courthouse, museum and landmark across Tennessee on one live map — find what's near you, get directions, and collect sites as you roam.

Download on the App Store
Free · ad-free · the iOS app and the web map share one account, so your visits sync across both

Nearby in Sullivan County