In 1913 Tennessee Power Company built the Great Falls-Spencer 46-kv Transmission Line, 12.1 miles long, as a section of a 151-mile line linking Nashville with Ocoee No. 1 Hydroelectric Plant. The towers were designed by H.M. Byllesby & Company and put together by the Nashville Bridge Company. Each galvanized steel tower stood 44 feet tall, weighed 2,215 pounds, and was built to stand up to severe weather. Football players from Vanderbilt University helped clear brush and trees from the right-of-way. Once the powerhouse was finished, the line was connected to Great Falls Hydroelectric Station. Tennessee Electric Power Company purchased the line in 1922, and the Tennessee Valley Authority took it over in 1939. The line was in service without interruption for 103 years. At the time Caney Fork Electrical Cooperation upgraded its substation in Spencer, Tennessee, TVA swapped the old line for a 161 kV line carried on steel poles.
Source: Tennessee Historical Commission marker 2E 84 (reworded by TennRoam)