Calderwood Hydroelectric Station in Blount County is a large, professionally designed plant of steel-reinforced concrete that the Aluminum Company of America began in August 1928; two of its three generators went into service in June 1930. Tunnels carry water through a horseshoe bend to the powerhouse, and only Ocoee No. 1 shares its curved spillway. When it was listed, it had made power without a break since 1930 for ALCOA's reduction plants and for household use. It was the last privately built hydroelectric site in Tennessee before the Tennessee Valley Authority was formed in 1933. It was listed for engineering and commerce, and possibly for giving rise to the hamlet of Calderwood and helping the company town of Alcoa grow.
Source: National Register nomination 90001016 (NPS)