The Calderwood Hydroelectric Development, on the Little Tennessee River where Blount and Monroe Counties meet, was built from 1928 to 1930 as the third plant of Alcoa's Tapoco Hydroelectric Project. It includes a dam, a Colonial Revival powerhouse, a pipeline and service buildings. Because steep rock walls ruled out side spillways, floodwater pours freely over the crest, and a 40-foot auxiliary dam about 300 feet downstream, inspired by natural waterfalls, forms a pool that absorbs the water's force. Its power fed the aluminum plants of Alcoa, one of the state's leading manufacturers, and was integral to Alcoa's supply of aluminum for aircraft and other war materials in World War Two. It was listed for engineering, architecture and industry.
Source: National Register nomination 04000545 (NPS)