The Pickwick Landing Hydroelectric Project, or Pickwick Landing Dam, is in Counce, Hardin County. The project got under way in 1934, with construction starting on March 8, 1935. It was the first project the Tennessee Valley Authority designed and the third it built, after Norris and Wheeler. The place was once called White Sulphur Springs; its first postmaster renamed it during the Civil War after the Pickwick Papers by Charles Dickens. The dam improved river navigation, powered World War Two industry, brought electricity to homes and checked floods. Listed on August 11, 2017, it was praised for its Streamlined Moderne design. A supplementary record dropped industry and social history and limited its statewide importance to engineering and transportation.
Source: National Register nomination MP100001467 (NPS)
About this site
Pickwick Landing Hydroelectric Project is a historic place in Counce, Hardin County. It is one of 10 historic places documented in Hardin County, among 597 historic sites cataloged across the county on TennRoam.
The site sits at 35.0717, -88.2516 near Counce. The nearest cataloged historic site is The Turbine (historical marker), about under a tenth of a mile away. Others within a short drive include Pickwick Landing Dam, The Civilian Conservation Corps and Pickwick Landing State Park, and Pickwick Landing.
This record is drawn from the National Register of Historic Places (Tennessee Historic Preservation Office and National Park Service). Use the map below for its exact position and turn-by-turn directions.
The National Register nomination, filed under the Tennessee Valley Authority hydroelectric multiple property listing, classifies the plant as Streamlined Moderne. Wikipedia reports that the dam was authorized in November 1934, its gates closed on February 8, 1938, and it opened on May 8, 1938, at a cost of just over $45 million. It stands 113 feet high and 7,715 feet long, with a 22-bay spillway, and has two navigation locks that lift boats up to 63 feet. The dam impounds Pickwick Lake, about 53 miles long with roughly 496 miles of shoreline, reaching to Wilson Dam. Its generating capacity is 240,200 kilowatts. Some dates differ between sources, so the nomination's March 1935 construction start is the safer reference.