The Story
Picture this turbine of carbon steel, weighing 125 tons, spinning 81.8 rotations each minute. Imagine over 99.491 gallons of water every second pouring through the intake to turn its heavy blades, which produce 36 megawatts of electricity. The Kaplan adjustable-blade turbine is over 24 feet wide and close to 13 feet tall. It was the fourth installed at Pickwick Dam and went into commercial operation in 1942. Huge as it is, the turbine has only a small part in the balanced river system of TVA. A diagram labels the parts of a hydroelectric dam: reservoir, intake, turbine, generator, powerhouse, power lines and river.
Source: Historical marker, reworded by TennRoam. Marker location: HMdb.org, https://www.hmdb.org/m.asp?m=108340
About this site
The Turbine is a historical marker in Savannah, Hardin County. It is one of 584 historical markers documented in Hardin County, among 597 historic sites cataloged across the county on TennRoam.
The site sits at 35.0722, -88.2512 near Savannah. The nearest cataloged historic site is Pickwick Landing Hydroelectric Project (historic place), about under a tenth of a mile away. Others within a short drive include Pickwick Landing Dam, The Civilian Conservation Corps and Pickwick Landing State Park, and Pickwick Landing.
This record is drawn from the Historical Marker Database (HMdb.org) for the marker's location, with the text reworded by TennRoam. Use the map below for its exact position and turn-by-turn directions.