J.G. White Construction Company started building Ocoee Dam #1 in 1910. A coffer dam was made out of big timbers and evergreen boughs, which were laid down to help hold back the dirt banks. A coffer dam walls off part of a body of water so that air can push the water out, leaving a dry place to work. Tracks were laid along the top of the coffer dam so dirt cars could dump into the dam to build a steam line. By July 1911 the framework stood ready for pouring cement, with help from stiff leg derricks. A stiff leg derrick is a mast kept upright by three fixed legs of timber or steel that form a tripod. The dam took so much concrete that the quarry ran day and night, and before long people called it the "Solid Concrete Parksville Dam." The work was finished in late December 1911. Some facts about the dam: It stands 135 feet high and is 840 feet long, and concrete totaling 17,000 cubic yards went into it. It is able to generate 19,200 kilowatts and has 5 generating units. At most it can discharge 45,000 cubic feet per second. The shoreline of Parksville Lake runs 109 miles, and the lake covers 1,930 acres of water. The dam was the first plant to send hydroelectric power to Chattanooga, and it remains the oldest plant that is still running.
Source: Historical marker, reworded by TennRoam. Marker location: HMdb.org, https://www.hmdb.org/m.asp?m=178044