Ocoee No. 1 was begun in 1910. The plant was supplying power to nearby Chattanooga 18 months later. The Tennessee Electric Power Company, known as TEPCO, was its designer and builder. In 1939 TVA acquired Ocoee No. 1 together with No. 2. Because the site lay in remote mountain country, the job meant more than building a hydroelectric plant. A small town also had to be built to house the workers, whose numbers reached 1,500. The concrete dam stands 33.5 meters, or 110 feet, high. It spans 256 meters, or 840 feet, from bank to bank, set between the steep sides of Sugar Loaf Mountain and Bean Mountain. To make electricity, water is let through the dam into penstocks, which are pipes running down to the powerhouse turbines below. The rushing water strikes the turbine blades so hard that they start to spin, and the turbine shafts are linked to generators that make electricity. There are five generators at Ocoee No. 1, and together they produce 22,000 kilowatts. The captions add more. Early in the 20th century the power company saw what water could do for generating electricity, and this Ocoee River site, 817 meters, or 2,025 feet, above sea level, became the first hydroelectric plant in Tennessee. Eleven stiff-leg derricks, each 27 meters, or 90 feet, were set up to lift and dump buckets of concrete that railroad flat cars brought to the dam. Each day upward of 600 bucket loads of concrete went into forms 4.6 meters, or 15 feet, long and 2.4 meters, or 8 feet, high. A railway had to be built across the river so that workers, equipment and crushed rock could be carried to the work site from a quarry on the river's south bank. The tracks are gone, but parts of the trestles are still there. In the plant's early years a coal plant beside the dam provided backup power. It last burned coal in 1954. The plant itself was taken away.
Source: Historical marker, reworded by TennRoam. Marker location: HMdb.org, https://www.hmdb.org/m.asp?m=178038